Taking a break for some food. Here are just a couple of pictures of what I managed to get done so far, today.
The first trellis bed is done. Had to mess around to get the ends of the sides the same height as the three end cap logs. Finally, just in case, I sprayed the holes each rod and rebar with clear sealant I got for the eavestroughs. The hollow rods in the middle end cap log I put in today had to be inserted at an angle, which would allow rain to drain right into the holes in the logs. The sealant isn’t made for something like this, but it’s what I had, and I think it should help. The bed is now ready to be filled.
I finally got the stump chair near the chain link fence built. Then, after adding another coat of paint to the sun room door, I painted the seat as well. Both will need one more coat.
While the day is still nice and the light holds, I’m going to tackle the felled trees in the spruce grove next.
My trip to pick up a parcel ended up taking longer than expected. It was a Purolator delivery, which now delivers to our post office, if we use their address, and we pick it up from there. Other times, we’ve had to go to town to pick it up, or to the slightly further town my mother lives in.
Not this time!
For some reason, they decided to drop it off at another, even further, town to the north of us.
Then didn’t tell us.
If the shipping address is just a box number, they call us and ask which depot to drop it off in. My husband got no such call. He didn’t even know it was coming by Purolator. When he placed the order, he thought it was coming by mail. They’re not very good about informing how things will be delivered!
Ah, well. It was just a bit of an extra drive. I still got to pick up the mail, where I found our seed packet arrived, in advance of the crocuses we ordered, as well as my subscription shipment of lysine for the outside cats.
Once I got home, I was soon heading outside to get ready to paint the stump bench and folding table, which included hosing them down and giving them a scrub. I left them to dry while setting up the paint supplies, only to hear a strange noise in the leaves above me.
It was starting to rain!
Of course… 😄
It wasn’t much, but that was okay. I was planning to work on the trellis bed logs while the bench and table dried, anyhow.
I wanted to start with the largest log that is going to be a bottom log in the bed. The other large one we recently cut might be an issue. It has a bend in it that I’m either going to have to work around, or find a straighter dead tree of the right size.
I brought over one of our saw horses to make debarking easier. I love that draw knife! The hard part was at the wide end. It just did not want to roll over and stay put, so I could do the underside! It took some fighting, and a handy wedge shaped rock to keep it from rolling back, but eventually, I got it all done.
The next step will be to hose it down, then trim away the branch nubs and other lumps, before moving on to the next log.
Ideally, I would char this before setting it in the ground, but to char a log this size all over, I would need a torch of some kind, and I don’t have one. Still, just debarking it will help, and all the bits of bark will be part of the garden bed layers.
By the time this was done, what little rain we had was long gone, and the bench and table were dry. Here are the before and after pictures.
I debarked the stump supporting the bench, too, then pressure sprayed it with the hose. It really should have been debarked when the bench was first made. I found sawdust and ant damage under the bark. Not enough to affect the stability of the stump, yet. It’ll hold that bench for a few more years!
I did not paint the stump or the end supports. Once all the greenery grows back, it should look like the bench is just floating.
These will get at least one more coat of paint before they’re done. If the forecasts are at all accurate, I should be able to do that tomorrow afternoon, then more rain supposed to hit our area.
It feels good to finally get at least a bit more progress on those trellis bed logs! This project is taking so much longer than it should have. 😕