Cat isolation shelter progress: the wire mesh is on, and laying down framework

I finally got to spend some time working on the cat isolation shelter today! It’s been way too long.

I decided to go ahead and put on the rest of the wire mesh on the lower level, and start preparing the upper level.

Here is a slideshow of one side that gave me a bit more trouble.

All the areas needing mesh were done, with the mesh first tacked on with staples. For the short sides, I started securing the mesh with wood lath across the bottoms. I then spent a bit of time working out how best to start framing for the clear panels that will be sliding doors, while further securing the mesh on the bottom half.

The clear panel, which still needs to be cut to the sizes I need, is a quarter inch thick. The wood lath is also a quarter inch thick, though individual pieces have variations in width, so that will work out perfectly for sliding channels.

For this side, I added long, vertical pieces of wood that would both secure the wire mesh on the bottom, while also starting to form a frame around the opening that the clear plastic will be covering. This is so that the panel will slide towards the back, over the section that’s insulated and covered.

If you click through to the next photo, though, you’ll see my problem on this side.

The floor boards were placed flush with the edge on the other side. A couple of boards were slightly longer. When covering the section on this side, I took advantage of that and rested the first piece of wood lath right on top of the parts that stuck out, then worked my way up.

There was no way a door panel could slide across with those there. Mostly, it was the one piece that stuck out the furthest, but a second piece had to be dealt with, too.

Thankfully, I have a pull saw with a very thin and flexible blade – a Bear Saw, which I think is a model, not a brand. You can see how flexible the blade is in the next photo of the slideshow. I was able to saw off the parts that stuck out, then use a rasp to take off any bits that were left.

In the last photo, you can see the rest of the framing in place. Some of this will be hidden from view when the sliding channels are complete.

For the sliding door’s channel, I will need to set pieces across the top and bottom, positioned so they will be flush with the panel. I’ll need to find the thickest and straightest pieces for this part!

I am pretty sure I’ll need to add more framing pieces, but I won’t be positive until I have the panels as a guide.

I’ll probably give a bit of extra space for the panel at the top, so it’s not too snug – but not too much space, or it’ll wobble when being opened and closed. Once those pieces are fixed in place – and I’m sure the panel can slide over the covered and insulated section unobstructed – two more vertical pieces will be added that will overlap the top and bottom of the panel, holding it in place.

If we need to remove the panel for some reason, it can be slid right out one end.

The rest went much more easily.

This is the front section.

The mesh for this section was just a square, but I made sure not to secure it too high. There needs to be enough space for the clear panel that will cover the front of the top level to have the overlap it needs to be screwed in place.

Here is the second short end.

The covered section is over the opening to the second level, so there are no floor boards at the bottom. The bottom piece of wood covering the insulation was lined up with the horizontal frame piece, which made the whole thing slightly lower than the cover on the other side. That gave me room to put a long piece of wood lath across the top as well as the bottom. The rest was done pretty much the same as the other side.

That was it for today. Tomorrow, we need to get the table saw set up so we can cut the clear panel pieces.

Once the clear panels are in place, the door/ramp on the bottom will be installed. Last of all, the roof will be assembled. I have some handles I can add to the sides to make it easier to move it around, too. They were meant for something else, but are needed here, more.

After that, it’s done until we can pick up more paint! With or without paint, though, we can bring it over to the house and set it where the cats can start checking it out and getting used to it.

We’ll need to pick up more heat lamps so that we can have one to set up inside the upper level of the isolation shelter during the winter. Even with insulated walls, the plastic room and clear panels have no insulation. They may be good for passive solar heat during the day, but not very good at night!

I just checked online and the lamps I had in my wishlist are on sale right now, so I’ve just ordered a pair of clamp lamps and a pair of ceramic heat bulbs. I think we still have a timer laying around, too. If it has a light sensor, we can set it up like the one in the cat shelter, so that it will automatically turn the heat on at dusk, then off during the day.

Hopefully, the cats will get to enjoy the shelter soon. Especially the ladies we’re building it for, and their post trap and spay recovery period!

The Re-Farmer

2 thoughts on “Cat isolation shelter progress: the wire mesh is on, and laying down framework

    • Even if you click on them? That is very strange. I assume you have an account, but you shouldn’t even need one.

      Thank you for letting me know. I have no idea how to fix it, though. Even for me, sometimes WordPress will let me see them in my posts, other times I get a message saying to click to see them on IG.

      Like

Leave a reply to rebecca s revels Cancel reply